PROJECTS
43%
28%
29%
9.6 MW Super Mai A Small Hydro Electric Project
Status: Completed
Project: Super Mai A HEP
Capacity: 9.6 MW
Location: Ilam District, Nepal
Turbine: Horizontal Francis
Head: 188.18 m
Year: 2020
5.5 MW Ichoo Hydro Electric Project
Status: Commissioned
Name: Ichoo HEP
Location: Jammu & Kashmir, India
Turbine: Horizontal 2 Jet Pelton
Head: 237 m
Substation: 6.6/33 kV (Indoor Switchgear)
Year: 2020